From shop fabrication to site installation.
This project documents a fabricated steel stair and landing package as it moved from component preparation in the shop to fitting and welding at the commercial site.
Built around the access conditions
Stair stringers, treads, landings, guardrails, and handrails were prepared as coordinated assemblies, then positioned and completed around the existing entrance and interior conditions.
